Covanta Community Liaison Panel – Full Minutes and Handouts – 12/06/17

Key Points –
– Environment Agency is currently considering further information from Covanta/Veolia following issues raised at the 1st Consultation
– 2nd stage is not likely to go ahead until September and will include a drop in session by the Environment Agency during the 2nd consultation period.
– Network Rail have confirmed they are upgrading the rail crossing which will then be remotely operated from the signal box – but this will increase the time the barriers are down to 5 minutes each time

Welcome to MMAG

The latest Community Liaison Panel Minutes are now available.

Minutes

Meeting 22 (4) – 12/04/17

Handouts

Low-Level Restoration Works – Update Presentation
Traffic Management Presentation

All previous minutes and handouts of the Community Liaison Panel dating back to September 2009 can be found by Clicking Here

View original post

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s