Covanta Community Liaison Panel – Full Minutes and Handouts – 12/06/17

Key Points –
– Environment Agency is currently considering further information from Covanta/Veolia following issues raised at the 1st Consultation
– 2nd stage is not likely to go ahead until September and will include a drop in session by the Environment Agency during the 2nd consultation period.
– Network Rail have confirmed they are upgrading the rail crossing which will then be remotely operated from the signal box – but this will increase the time the barriers are down to 5 minutes each time

Welcome to MMAG

The latest Community Liaison Panel Minutes are now available.

Minutes

Meeting 22 (4) – 12/04/17

Handouts

Low-Level Restoration Works – Update Presentation
Traffic Management Presentation

All previous minutes and handouts of the Community Liaison Panel dating back to September 2009 can be found by Clicking Here

View original post

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s